Camper layout

Camper layout

Sunday, July 7, 2013

Tater Tot has moved to a new family.

Tater Tot is all fixed up and has been out on several camping trips. So glad she didn't go to the scrap pile!







Saturday, December 24, 2011

Maybe it will be ready for March!?










Opened her up this December break. Got her good and clean. Decided to pull all the chains and make an external lift. I still need to order the living hinge, but we will be closer to camping in her then. Yay!

Thursday, June 30, 2011

It's been a while.

So, here we are a year later and I am not as far into the project as I should be. Got both the tires fixed and found out that I need to get some bearings fixed on one wheel. In the meantime, I am going to order the living hinge and attempt to open the gear box and figure out the chain problem. I am super nervous, but I have a back up plan if that doesn't work. I am about to leave for a month of vacation and I still haven't sewn the curtains. I am such a bum. I am determined to have this camper ready to camp in October!

Sunday, October 10, 2010

Curtain material!



We got the material for the curtains. I was going to get an owl print online, but it was a little pricey. This material has a bit of a retro look to it. I can add owls to the rest of the decor later. I think I will have enough to make some pillows too.

Saturday, October 9, 2010

My new fixer-upper CD!


I forgot to post about the CD that I got for my birthday in July. My brother and his wife got me the Powerpoint presentation on CD that goes through how to change out the lift system. I am so excited except that is was so blazin' hot this summer, I didn't want to do anything outdoors. Oh. Well. Waiting for the nicer weather!

Saturday, May 29, 2010

Just doing some cleaning






You can see the awesome 70's floor and the original color of the camper in these pictures.

Friday, May 28, 2010

Stuff to get done

Here is a preliminary list of things I need to get done.
1. Get chain fixed.
2. Sew curtains.
3. Find VIN.
4. Recover seat cushions.
5. Replace table and counter edging.
6. Replace bed end corners.
7. Replace windows.
8. Clean inside.
9. Wash outside.